Harvard-Westlake School
Harvard-Westlake School LOG IN
 
 
Harvard-Westlake Middle School Modernization Project
   

At Harvard-Westlake, a New Era Begins

The Middle School Modernization Project provides an optimal academic environment for current and future students. The new campus layout harmoniously incorporates new buildings into the existing campus landscape and the neighborhood. Several existing structures were replaced with two new, modern classroom, administrative and arts buildings. Improved parking and traffic flow have been incorporated throughout the campus.

Phase II, which includes an expanded athletic field and upgrades to existing buildings, is expected to be complete in 2009.

Floors, Roofs and Walls Appear on Construction Site
Monday, November 12, 2007
The roofs and floors of both the new academic building and the new library/science building are in place.  The walls are going up now, which means before we know it, the interior of each building will be "under construction."

The photo at left is an aerial view of the construction taken in early November. 


Labeled Rendering of Completed Middle School Campus
Monday, October 08, 2007
This image is an "aerial" perspective of what the completed Middle School campus will look like. Streets, buildings, and other landmarks are identifed, and the labels include information about what will be housed in some of the buildings. Click the following text to see the full-size image. Read More...

Page: 3 of 3 Previous Page | Next Page

Current Articles | Categories | Search | Syndication

   

Middle School | 700 North Faring Road | Los Angeles, CA 90077 | 310-274-7281
Upper School | 3700 Coldwater Canyon | North Hollywood, CA 91604 | 818-980-6692
Copyright 2005-2007 by Harvard-Westlake School